Detalhes do produto:
Condições de Pagamento e Envio:
|
Tensão nominal: | 1000 V DC | Temperatura nominal: | 90ºC |
---|---|---|---|
Material do condutor: | De cobre desencapado encalhado | Material de bainha: | TPE |
Material de isolamento: | Termoplástico | Conjunto do cabo: | 2c × 70mm2+1c × 25mm2+2c × 4mm2+12c × 0,75mm2 |
Resistência máxima de DC: | A: 0,272Ω/km, B: 0,78Ω/km, C: 4,95Ω/km, D: 26Ω/km | Teste de resistência à tensão: | A&B & C: DC 8,4kV/15min, D, E: DC 3,6kV/15min |
Resistência à tracção: | ≥10MPa | Alongamento: | ≥250% |
Condição envelhecida: | 135 ± 1ºC × 168H | Espessura da jaqueta: | Nom. 4,20mm, min. 3,47 mm |
Diâmetro do cabo: | 37,60+0,60/-1,00mm | Pacote de transporte: | 220m/roll |
Capacidade de produção: | 30KM/Day | ||
Destacar: | Copper Conductor EV Charging Cable,TPE Sheath Electric Vehicle Charging Cable,Flame Retardant EV Power Cable |
ITEM | A: 2C×70mm² | B: 1C×25mm² | C: 2C×4.0mm² | D: 12C×0.75mm² |
---|---|---|---|---|
CONDUCTOR Material | Bare copper stranded | |||
Size | 2257/0.20mm | 798/0.20mm | 224/0.15+10/1#Tinsel+1000D Kevlar | 40/0.15+10/0.19mm#Tinsel+200D Kevlar |
O.D.(Ref) | 11.80mm | 7.10mm | 2.70mm | 1.30mm |
INSULATION Material | Thermoplastic | |||
Nom. thickness | 1.40mm | 1.20mm | 1.00mm | 0.50mm |
Min.thickness at any point | 1.16mm | 0.98mm | 0.80mm | 0.35mm |
O.D. | 14.60±0.40mm | 9.50±0.30mm | 4.70±0.20mm | 2.30±0.15mm |
TWISTED Filler | / | / | / | Cotton |
Material | / | / | / | Al-mylar(Foil facing out) |
BRAIDING Material | / | / | / | Tinned copper |
Size | / | / | / | 0.12mm,Min 60% |
CABLING Filler | PP rope | |||
Material | Nonwoven tape | |||
Assembly | 2C×70mm²+1C×25mm²+2C×4mm²+12C×0.75mm² | |||
JACKET Material | TPE | |||
Nom. Thickness | 4.20mm | |||
Min.thickness at any point | 3.47mm | |||
O.D. | 37.60+0.60/-1.00mm |
Rated voltage | DC 1000V | Tensile strength | ≥10MPa |
Rated temperature | 90ºC | Elongation | ≥250% |
Max. DC conductor resistance(20ºC) | A: 0.272Ω/km B: 0.78Ω/km C: 4.95Ω/km D: 26Ω/km |
Aged condition | 135±1ºC×168h |
Voltage withstand test | A&B&C: DC 8.4kV/15min D,E: DC 3.6kV/15min |
Percent of original tensile strength | ≤±25% |
Percent of original elongation | ≤±25% |
Founded in 2004 with 9 million USD capital investment, our HQ factory in Kunshan covers 14,980 square meters. In 2020 we established our Nantong facility with 100 million RMB capital investment covering 34,000 square meters.
With ISO9001, ISO14001, IATF16949, ISO13485 system certificates, all of our products have passed CCC, UL, CUL, CE, CSA, ETL safety certifications. We serve global customers across various industries through our well-established sales system based on the management principles of HONESTY, INNOVATION and ENVIRONMENTAL PROTECTION.
A: We produce consumer electronics wires, hook-up wires, industrial cables, robot cables, EV charging cables, and new/green energy cables.
A: We hold UL, CE, 3C, Dekra, CQC, TUV, Rohs, Reach, and ETL certifications.
A: Yes, we can arrange samples for evaluation.
A: Standard lead time is 2-3 weeks, extending to 5-6 weeks during peak seasons.
A: We conduct pre-production sampling and final inspection before shipment to ensure quality standards.
Pessoa de Contato: Jimmy Wang
Telefone: 17715039722